Monday, November 21, 2016

The Tramways - The Colonial Heritage


The Calcutta tram is a tram system in Calcutta, India, run by the Calcutta Tramways Company (CTC). It is currently the only operating tram network in India and the oldest operating electric tram in Asia, running since 1902. A last remnant of the British Empire operating in India.

An attempt was made in 1873 to run a 2.4-mile (3.9 km) tramway service between Sealdah and Armenian Ghat Street on 24 February.The service was not adequately patronised, and was discontinued on 20 Nov.

In 1880, the Calcutta Tramway Co. Ltd was formed and registered in London on 22 December. Metre-gauge horse-drawn tram tracks were laid from Sealdah to Armenian Ghat via Bowbazar Street, Dalhousie Square and Strand Road. The route was inaugurated by the Viceroy, Lord Ripon, on 1 November.

Steam locomotives were deployed experimentally in 1882 to haul tram cars.By the end of the nineteenth century the company owned 166 tram cars, 1000 horses, seven steam locomotives and 19 miles of tram tracks. During 1900, Electrification of the tramway, and reconstruction of tracks to 4 ft 81⁄2 in (1,435 mm) (standard gauge) began to happen.

The first electric tramcar in Asia ran in 1902 from Esplanade to Kidderpore on 27 March, and on 14 June from Esplanade to Kalighat.The Kalighat line was extended during 1903 to Tollygunge, the Esplanade line to Belgachhia (via Bidhan Sarani, Shyambazar), and the Esplanade to Shialdaha route (via Binay Badal Dinesh Bag, Rajib Gandhi Sarani and [present] Mahatma Gandhi Road) opened.

Esplanade to Bagbazar route through College Street opened in 1904.During 1905, Howrah Station to Bandhaghat route was opened to trams in June. Electrification project completed.Bowbazar Junction to Binay Badal Dinesh Bag, Ahiritola Junction to Hatibagan Junction routes opened during 1906.

Lines to Shibpur via G.T. Road were prepared in 1908. Esplanade to Shialdaha station via Moula Ali Junction, Moula Ali Junction to Nonapukur, Wattganj Junction to J.Das Park Junction (via Alipur), Mominpur Junction to Behala routes opened. Sealdah Station to Rajabazar route opened during 1910.

Mirzapur Junction to Bowbazar Junction and Shialdaha Station to Lebutala Junction routes opened during 1915. In 1920 the Strand Road Junction to High Court route opened. S.C.Mallik Square Junction to Park Circus route (via Royd Street, Nonapukur) opened during 1923.The Barhabazar Junction to Nimtala route opened in 1925. During 1928, the Kalighat to Baliganj route opened.

The Park Circus line extended to Garhiahat Junction in 1930. The Rajabazar line extended to Galiff Street during 1941.The Calcutta system was well connected during 1943 with the Howrah section through the new Howrah Bridge in February.With this extension, the total track length reached 42.0 miles (67.59 km).

During 1951, the government of West Bengal entered into an agreement with the Calcutta Tramways Company, and the Calcutta Tramways Act of 1951 was enacted.

The government assumed all rights regarding the Tramways, and reserved the right to purchase the system (with two years' notice) on 1 January 1972 or any time thereafter. The Government of West Bengal passed the Calcutta Tramways Company (Taking Over of Management) Act and assumed management on 19 July 1967. On 8 November 1976 the Calcutta Tramways (Acquisition of Undertaking) ordinance was promulgated, under which the company (and its assets) united with the government.




No comments :

Post a Comment